Duri ng normal h v test s on sw itchgear or gi s, the cts are inc luded in the h v test. The medium voltage switchgear ax1 complies with standards as set out in table. The transition section is removed from the metalclad switchgear, assembled and shipped separately. Switchgear and switchboard assemblies transformers, dry type, and liquid filled cables, low and medium voltage. Preventive testing and maintenance carried out on a regular basis. A conventional local control system in a substation uses copper wires to. Dec 18, 2014 switchgear testing facilities for acbs, rccbs, rcbos, mcbs, contactors, starters, ltht panel assemblies, bus bar truncking system, ht circuit breakers, vcbs.
Operating mechanisms outside switchgear vessel gas compartment maintenancefree operating mechanism parts mechanical switch position indication integrated in mimic diagram switchgear. By following the individual steps, and applying all those which are applicable, the engineer insures that the commissioning process is always performed in a consistent and methodical manner. Aluminium joining piece with silver plated contact surfaces. Inspection, testing and commissioning of electrical. All testing required prior to rotating the generating unit under power hydraulic or electrical which is unique to the unit and not associated with system testing. Primary injection primary and secondary current injection tests are normally conducted to check the operation of circuit breaker and their protective relaysdevices. Assembly of such devices in a logical manner forms a switchgear. The steps of the commissioning procedure are as follows. For this reason they are required to be extremely reliable. Take precautions and observe safety procedures before servicing the breaker or equipment. A switchgear or electrical switchgear is a generic term in automation which includes all the switching devices associated with mainly power system protection. Procedures for joining mvs enclosures at shipping splits. We are able to use thermal imaging cameras to record and locate hot spots in panels and equipment.
Should the switchgear be positioned on its foundation prior to the power transformer, the compiete. D circuit breaker alarm breaker failure bgma test procedure. By following the individual steps, and applying all those which are applicable, the engineer insures that the. Specific models of switchgear apparatus are not described in detail because of the large variety of models available. Commissioning process for new substation equipmenthayes.
Switchgear testing and maintenance the security of supply depends on switchgear being available at all times and functioning correctly. Procedure h r a 7 switchgear mechanical operation test procedure iec, nec, nema, fdf, iso ansi, ci, ipcea iec, nec, nema, fdf, iso ansi, ci, ipcea procedure h r a inspection and test plan for. Simpler manual and electrical tripping only requires cancelling the permanent. Preventive testing and maintenance carried out on a regular basis guarantee that everything functions reliably should a fault occur.
The tool invites you to complete four types of design input data forms levels of information, i. However, our testing solutions have revolutionized circuit breaker testing. The switchgear system ax1 is system for the distribution of medium voltage in power and industrial installations. It also includes all devices associated with control, metering and regulating of electrical power system. This section specifies the furnishing, installation, connection and testing of the medium voltage switchgear. A live tester is one that has to touch the conductor under test in order to determine if it is live or dead it is recommended that one with audible and visual annunciation is. The international electrical testing association neta was formed in 1972 to establish uniform testing procedures for electrical equipment and apparatus. Arrangement of bus bar, circuit breaker and isolator. Procedures given for testing external insulation subjected to wet, dry.
Perform a power factor test on each pole open and closed and each bushing. Rather, maintenance information is presented for five classes of switchgear equipment. The testing solutions we offer include systems that can supply power during the testing process and are capable of measuring the microohm resistance across the closed. A live tester is one that has to touch the conductor under test in order to determine if it is live or dead it is recommended that one with audible and visual annunciation is used. After installation of the switchboards, all the bus bar bolts are torque tested as per manufacturers recommendations with a torque wrench. The aim of this documentation is to outline the fat procedure of low voltage main switchboard. The above equipment and systems integral to them are complete and ready for functional testing. Switchgear and switchboard inspection and testing guide. Switchgear devices are constantly subjected to external influences such as dirt, humidity and temperature fluctuations. These live testers are manufactured in two different types s and l.
Switchgear testing and maintenance we inspect, report on, repair and calibrate hv and lv circuit breakers, contactors, transfer switches, engine devices such as exhaust gas thermocouples and other. Disconnect all low voltage and medium voltage power sources to the switchgear assembly before working on the equipment per the occupational safety and health act osha and lockout procedures. This may be the only opertunity you will ever have to dismantle a 1200 amp breaker for an inside look. The megger insulation tester is essentially a highrange resistance meter ohmmeter with a builtin directcurrent generator.
This handbook provides general guidelines for the proper maintenance of electrical switchgear used in postal facilities. Primary current injection testing operation of circuit. The procedure identifies a practical sequential approach that can be applied to every project. Operators of sf 6 switchgear must keep records for each piece of equipment that is subject to a. Manual testing a breaker failure element inside a standard relay. Download method statement for mv lv switchgear panel testing. Current limiting reactors in power system and their arrangement calculation of fault mva for symmetrical short circuits. In this article i go to share the actual what we do in after panel switchgear installation and what are the procedure of switchgear testing and commissioning. With central elements such as busbars, disconnectors and circuit breakers, switchgears represent the hubs of electrical energy grids. Testing and maintenance of protective gear, protection against surgesurge absorber, surgediverter. Procedure h r a 7 switchgear mechanical operation test procedure iec, nec, nema, fdf, iso ansi, ci, ipcea iec, nec, nema, fdf, iso ansi, ci, ipcea procedure h r a inspection and test plan for switchgear before manufacturing materials activity by no. The first neta maintenance testing specifications for electrical power equipment and systems was published in 1975. Thats something you should probably discuss with the customer though.
The megger insulation tester is a small, portable instrument that gives you a direct reading of insulation resistance in ohms or megohms. But for acceptance testing on low voltage switchgear, especially for short 1minute tests, the increased practicality might outweigh the minor benefits of using a vlf. Overpotential test voltage for lowvoltage switchgear. The timing pattern of the be3200 can be synchronized to the mains generator, the external mains or derived from an internal timer. Inspect the physical, electrical, and mechanical condition of switchgear or switchboard, including its anchorage, alignment, grounding and required clearances. The following additional documents must be observed for this switchgear. A protective device coordination study analyzes the impacts of short circuits and equipment failures within a facility and determines the effects on the facility operation. Circuit breaker testing typically focuses on performing motion and time measurements on the units. Operating mechanisms outside switchgear vessel gas compartment maintenancefree operating mechanism parts mechanical switch position indication integrated in mimic diagram switchgear interlocking system with logical mechanical interlocks cable testing without the need to isolate the bus bar see cable testing on page 98.
Operation testing of the generating unit from initialpowered rotation to verify suitability for operation. Purchase contract with the agreements on the configuration of the switchgear and with the legal details operating manual for wi series the appropriate switchgear. Switchgear testing facilities for acbs, rccbs, rcbos, mcbs, contactors, starters, ltht panel assemblies, bus bar truncking system, ht circuit breakers, vcbs. The switchgear specification manager will be subject to new releases andor revisions accordingly.
The training is mostly hands on testing that will be helpful in all aspects of the electrical industry. Study and testing of thermal overload relay for induction motor protection 1823 5. If the switchgear or panels cannot be installed immediately, then the same shall be stored in. The test procedure described are applicable to metal clad switchboards. Fully crated switchgear or panels shipped on a timber subbase will only. Instruction sheet ms28 maintenance of electrical switchgear tl4. Inspection and test plan reference document acceptance criteria verifying document 1. The draft inspection and test plan provided as well. Ieee 1248 guide for the commissioning of electrical systems. After inspection of hv switchgear and approval by consultants, proper care will be taken to protect the unit from dust by suitable covering, and shall further be released for the testing work.
Switchgear testing and commissioning procedure busbar torque test. If the switchgear is going to be installed as soon as it has been received, unpack it and handle it according to the procedure outlined in the following paragraphs. Repack it so it will be protected until it has been installed. Switchgear testing and maintenance we inspect, report on, repair and calibrate hv and lv circuit breakers, contactors, transfer switches, engine devices such as exhaust gas thermocouples and other equipment which form parts of these installations. Megger guide to electrical insulation testing pdf instrumart. Instructions for installation, operation and maintenance of. Every electrician should be familiar with the operation of meggers and hipots. Method statement for installation of hv switch gear 11 kv. Manual installation commissioning environment and recycling. Electrical engineers that perform maintenance, cleaning, testing, repair, and infrared inspection of indoor and outdoor switchgear. Instructions for receiving, handling, storing and installation of. Switchgear testing and maintenance taranis power group.
In this article i go to share the actual what we do in after panel switchgear installation and what are the. If you are interested in full list of method statement for electrical testing and commissioning please. Oct 28, 2016 system function test for switchgear and switchboards. Dlro contact resistance insulation testing megger test perform a contactpole resistance test. Electrical engineers that perform maintenance, cleaning, testing, repair, and infrared inspection of indoor and. Check equipment schedule for correct location and reference for the switchgear and panels. Medium voltage switchgear specification page 1 medium voltage metal clad switchgear part 1 general 1. Specific models of switchgear apparatus are not described in detail because of the. Sector description the electricity industry makes use of equipment insulated with sf 6. Since 1989, revised editions of the maintenance testing specifications have been. Safe installation procedures for electrical switchgears. New methods for switchgear test ing and analysis highvoltage switchgear equipment is located at the nodes of electrical power supply systems.
Electrical switchboard switchgear testing and commissioning manual from 3. The complete guide to electrical insulation testing. Completely read each procedure while looking at the actual parts before beginning. For good insulation, the resistance usually reads in the megohm range. By the end of this course the participants will have the basic knowledge to perform commissioning and acceptance testing of. Switchgear testing requires a device for accurate sequence and timing control. Safe installation procedures for electrical switchgears gil. For good insulation, the resistance usually reads in the megohm. The procedure for system functional testing exceeds far beyond the scope of this document. It is a complete switchgear system, prepared and operations tested on delivery. S horted the cts secondary to ground and isolat ed from relays and m eters. If the switchgear is to be stored, inspect it to make sure the shipment is complete and undamaged. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.
Safe operation and maintenance of circuit breakers and. In practice, as you will see in the test methods described below, you read a value that is. Approved lv main switchboard to be used for the fat. Neta developed specifications for the acceptance of new electrical apparatus prior to energization and for the maintenance of existing apparatus to determine its suitability to remain in service. Maintenance testing we recommend and provide includes the following and more. Standard for acceptance testing specifications for.
The be3200 is a high speed test sequencer for switchgear applications. Download method statement for mv lv switchgear panel. Thoroughly understand what is to be done and follow the procedure step by step. We service electrical circuit breaker panels and panelboards, motor contr. Electrical switchboard switchgear testing and commissioning. System function tests should be performed in accordance with ansinetaats section 8 during initial switchgear switchboard acceptance. If the switchgear or panels cannot be installed immediately, then the same shall be stored in clean, dry and properly ventilated location. Pdf testing of switchgear operation in an iec 61850 based sas. The following test demonstrates the combined test procedure that merges the two test.
A switchgear consists of a number of switchgear cubicles with connecting equipment and one or more support cubicles. When performing acceptance testing, verify that the equipment nameplate data matches project drawings and specifications. A live tester is one that has to touch the conductor under test in order to determine if it is live or dead it is recommended that one with audible and visual annunciation. All outputs and inputs of the be3200 are fiber optically isolated. Ieee 1248 guide for the commissioning of electrical.
1476 560 851 586 736 554 51 713 223 1052 1341 451 727 1248 576 1331 711 425 1419 757 139 377 425 1055 895 664 1474 815 814